Our Process

Our Cleaning & sealing Process

Click here to view our Installations processes

As a Constructive customer you will benefit from choosing which service package you would want to adopt.

We have an array of packages specifically designed to suit most driveway and patio needs. If this isn't enough, with your help we can also tailor make a package to suit any other requirements you may want.

Our standard package shown below will give you an idea into the depth of process we use, noting that this is only our entry package. Whether your home is paved with Pattern Imprinted Concrete, Block Paving, Tarmac or Flags we will guarantee a first class service, using only the highest quality products at value for money prices. We are confident that we can transform your paved area into a driveway to be proud of.

Step 1

Free analysis- one of Constructive's friendly professionals will visit your property and with your help fill out a condition report. This will then point out the main recommendations and resolutions.
It really is that simple!

Step 2

Using our state of the art rotary cleaning equipment we will begin the refurbishment of your paving, ensuring a thorough job is completed.

Step 3

Apply Constructive's specially formulated oil and stain remover. Then wash the area again.

Step 4

Application of Constructive's Long Life Degrease

Step 5

Application of Long Life Algae and Lichen Preventer.

Step 6

If recommended or requested on the intial paving analysis report, we will proceed to re-lay and replace any rutted or broken block.

Step 7

To ensure a thorough and deep clean, a further bleach application will be applied to ensure all excess algae and lichen is killed off! We will then give the driveway a final wash off and weed treatment.

Step 8

For Block Paved driveways, re-sanding is a key element to the structural integrity of the block. We will re-sand the entire area using only a premium quality kiln dried sand. A note to our customers is that this element of the process is usually carried out 2-3 days after the initial rotary clean. It is best practice to resand when the paving is dry as this will allow the sand grains to fall deep within the joints.

Click for Block PavingClick for FlagsClick for TarmacClick for PIC

Sealing - Ultimate protection

For the ultimate driveway protection, our sealing service proves very popular with many of our customers.

At Constructive Driveways we have researched into the general sealants available to the homeowner. In our experience some of these products are nothing more than water based surface varnishes; they can be expected to last no longer than 6 months at best.

Constructive Driveways will only use the highest quality industrial, tried and tested sealing materials available within the industry. Our sealants applied correctly can offer your driveway a very aesthetically pleasing look, accompanied by the reassurance of durability and integrity to provide years of service.

> Why Choose Us